Energy Efficiency in County Buildings

Project ID: 
2013 SPLOST
Project Type:
Capital Project
Project Status: 
Approved
Floyd County Health Department Air Handler

Proposal for a new HVAC system in the Law Enforcement Center, replacing with new energy efficient to reduce power consumption and save money on energy costs. Included in the proposal is a motor controller installation (variable frequency drive) on existing HVAC responsible for cooling the Forum and the Judicial building. This will allow the unit to run in stages and reduce the amount of power used to run the machine daily. In addition to HVAC upgrades, low efficiency lighting will be replaced with high efficiency, low maintenance lighting in county buildings.

Floyd County Health Department Chiller
Law Enforcement Center Chiller
Library Chiller
LED lighting at Law Enforcement Center
LED lighting in LEC Parking Deck
Status Updates

2019 - Project completed. HVAC and control systems at the Health Department, Law Enforcement Center and the Library were replaced with new, energy efficient systems.

6.23.2014 - Contract for design and engineering approved. Work underway for LEC, Health Department, and Library.